NO DECKING BOARDS? NO PROBLEM...
The new Cure It EVO System has been designed for application DIRECT TO INSULATION BOARDS. Installation is quicker and more cost effective than the traditional method for installing GRP warm roofs.
NO DECKING BOARDS?
NO PROBLEM...
The new Cure It EVO System has been designed for application DIRECT TO INSULATION BOARDS. Installation is quicker and more cost effective than the traditional method for installing GRP warm roofs.

Cure It Evo is an easy to use system: simply fit the insulation, apply the Evo Primer and Evo Basecoat laminate then apply the Topcoat to finish.

Cure It Evo Primer has been specially formulated to bond directly onto foil-backed insulation boards. This means that you no longer need a timber deck on insulation when installing a warm roof, saving you the cost and labour time of installing an entire OSB deck.

Cure It Evo Basecoat and Reinforcement Mat can then be applied directly to the Primer. The Basecoat is easy to apply and forms the laminate that is durable, creating a hard wearing waterproof surface.

To complete the roof installation, Cure It Topcoat (available in various colours) is applied to provide an extreme UV resistant finish.

No Boards
NO DECKING BOARDS REQUIRED
  • Only a single sub deck required
  • No OSB deck required on top of insulation boards
  • Sub deck can be any structural wood boards
money
LOWER COSTS
  • Standard insulation fixings and ply-decking can be used in build-up.
  • Only one decking layer required.
  • 20% cheaper material cost.
Easy
EASIER FITTING
  • Less specialised installation process.
  • Uses more standardised components.
  • Simplified trim installation.
quick
QUICKER INSTALLATION
  • Over 50% fewer fixings required.
  • Reduces warm roof installation time by over 20%.
  • Decking and insulation build-up can be installed by 3rd party joiners/builders.

Cure It Evo has been designed for application direct to insulation, removing the need for a OSB board deck.

  • Suitable structural wood boards used for the subdeck (OSB/Ply wood).
  • Vapour Control Layer required to prevent condensation build up.
  • Insulation boards (120mm) fixed to the subdeck using suitable mechanical fixings and washers (provided in kit box).
  • 50mm Aluminium foil tape used to secure trims to the insulation (no requirement for clout nails).
  • Apply Cure It Evo Primer directly to the insulation boards (this replaces the need for an OSB deck).
  • Apply Cure It Evo Basecoat with 450g per metre square Reinforcement Mat.
  • Finish with Cure It Topcoat.
Cure It Evo Installation Video

The Cure It Evo installation video provides an overview of the installation process.

Technical Support

For further information please contact our Technical Support team on 03301 222666 or email enquiries@cureit.com

Cure It Evo Products

The Cure It Evo Primer pack is available in 7.5 metre square and 15 metre square roof pack sizes.

  • Cure It Evo Primer Pack (Available as 7.5 metre square / 15 metre square)
    Pack includes: Evo Primer / Mechanical Washer Fixings / Installation Instructions
  • Cure It Evo Basecoat (15Kg)
  • RGB Building Supplies (Ilfracombe)
    (Tuesday 19 October, 8am – 12pm)
  • Bradfords Building Supplies (Axminster)
    (Thursday 21 October, 8am – 12pm)
  • SBS Building Supplies (Kendal)
    (Friday 22 October, 8am – 12.30pm)
  • JT Atkinson Builders Merchant (Cockermouth)
    (Tuesday 26 October, 8am – 12.30pm)
  • JT Atkinson Builders Merchant (Kendal)
    (Wednesday 27 October, 8am – 12.30pm)
  • Bradfords Building Supplies (Sherborne)
    (Thursday 28 October, 8am – 12pm)
  • Onestop Roofing Supplies (Glasgow)
    (Friday 29 October, 8am – 12.30pm)
  • Bradfords Building Supplies (Bridport)
    (Monday 1 November, 8am – 12pm)
  • JT Dove Building Materials (Berwick)
    (Tuesday 2 November, 8am – 12.30pm)
  • Beatsons Building Supplies (Dunfermline)
    (Wednesday 3 November, 8am – 12.30pm)
  • Selco Builders Warehouse (Swansea)
    (Thursday 4 November, 8am – 12pm)
  • SBS Building Supplies (Dumfries)
    (Thursday 4 November, 8am – 12.30pm)
  • Willis Westcott Roofing Supplies (Worcester)
    (Friday 5 November, 8am – 12pm)
  • Bradfords Building Supplies (Taunton)
    (Monday 8 November, 8am – 12pm)
  • SIG Roofing (Broxburn)
    (Monday 8 November, 8am – 12.30pm)
  • SIG Roofing (Kirkcaldy)
    (Tuesday 9 November, 8am – 12.30pm)
  • SIG Roofing (Edinburgh)
    (Wednesday 10 November, 8am – 12.30pm)
  • Bradfords Building Supplies (Penzance)
    (Wednesday 10 November, 8am – 12pm)
  • Selco Builders Warehouse (Liverpool)
    (Thursday 11 November, 8am – 12pm)
  • SIG Roofing (Inverness)
    (Thursday 11 November, 8am – 12.30pm)
  • Bradfords Building Supplies (Avonmouth)
    (Thursday 11 November, 8am – 12pm)
  • Meir Roofing & Insulation Supplies (Goole)
    (Friday 12 November, 10am)
  • Bradfords Building Supplies (Exeter)
    (Monday 15 November, 8am – 12pm)
  • MKM Building Supplies (Glasgow)
    (Tuesday 16 November, 8am – 12.30pm)
  • Bradfords Building Supplies (Bude)
    (Wednesday 17 November, 8am – 12pm)
  • JT Atkinson Builders Merchant (Penrith)
    (Wednesday 17 November, 8am – 12.30pm)
  • JT Dove Building Materials (Seahouses)
    (Thursday 18 November, 8.30am – 12.30pm)
  • MKM Building Supplies (Hexham)
    (Friday 19 November, 8am – 12.30pm)
  • Burton Roofing Supplies (Brechin)
    (Tuesday 23 November, 8am – 12.30pm)
  • Bradfords Building Supplies (Dorchester)
    (Wednesday 24 November, 8am – 12pm)
  • MKM Building Supplies (Alnwick)
    (Wednesday 24 November, 8am – 12.30pm)
  • Bradfords Building Supplies (Worcester)
    (Thursday 25 November, 8am – 12pm)
  • MKM Building Supplies (Morpeth)
    (Thursday 25 November, 8am – 12.30pm)
  • Sydenhams Building Supplies (Gillingham)
    (Monday 29 November, 8am – 12pm)
  • Bradfords Building Supplies (Yeovil)
    (Tuesday 30 November, 8am – 12pm)
  • Bradfords Building Supplies (Newton Abbot)
    (Wednesday 1 December, 8am – 12pm)
  • RGB Building Supplies (Tiverton)
    (Tuesday 7 December, 8am-12pm)

For all Cure It Demo Days, check out the Cure It Demo Day listing page