NO DECKING BOARDS? NO PROBLEM...
The new Cure It EVO System has been designed for application DIRECT TO INSULATION BOARDS. Installation is quicker and more cost effective than the traditional method for installing GRP warm roofs.
NO DECKING BOARDS?
NO PROBLEM...
The new Cure It EVO System has been designed for application DIRECT TO INSULATION BOARDS. Installation is quicker and more cost effective than the traditional method for installing GRP warm roofs.

Cure It Evo is an easy to use system: simply fit the insulation, apply the Evo Primer and Evo Basecoat laminate then apply the Topcoat to finish.

Cure It Evo Primer has been specially formulated to bond directly onto foil-backed insulation boards. This means that you no longer need a timber deck on insulation when installing a warm roof, saving you the cost and labour time of installing an entire OSB deck.

Cure It Evo Basecoat and Reinforcement Mat can then be applied directly to the Primer. The Basecoat is easy to apply and forms the laminate that is durable, creating a hard wearing waterproof surface.

To complete the roof installation, Cure It Topcoat (available in various colours) is applied to provide an extreme UV resistant finish.

No Boards
NO DECKING BOARDS REQUIRED
  • Only a single sub deck required
  • No OSB deck required on top of insulation boards
  • Sub deck can be any structural wood boards
money
LOWER COSTS
  • Standard insulation fixings and ply-decking can be used in build-up.
  • Only one decking layer required.
  • 20% cheaper material cost.
Easy
EASIER FITTING
  • Less specialised installation process.
  • Uses more standardised components.
  • Simplified trim installation.
quick
QUICKER INSTALLATION
  • Over 50% fewer fixings required.
  • Reduces warm roof installation time by over 20%.
  • Decking and insulation build-up can be installed by 3rd party joiners/builders.

Cure It Evo has been designed for application direct to insulation, removing the need for a OSB board deck.

  • Suitable structural wood boards used for the subdeck (OSB/Ply wood).
  • Vapour Control Layer required to prevent condensation build up.
  • Insulation boards (120mm) fixed to the subdeck using suitable mechanical fixings and washers (provided in kit box).
  • 50mm Aluminium foil tape used to secure trims to the insulation (no requirement for clout nails).
  • Apply Cure It Evo Primer directly to the insulation boards (this replaces the need for an OSB deck).
  • Apply Cure It Evo Basecoat with 450g per metre square Reinforcement Mat.
  • Finish with Cure It Topcoat.
Cure It Evo Installation Video

The Cure It Evo Build-up animation provides an overview of the installation process.  A full installation video guide will be available on the Cure It YouTube Channel soon.

Technical Support

For further information please contact our Technical Support team on 03301 222666 or email enquiries@cureit.com

Cure It Evo Products

The Cure It Evo Primer pack is available in 7.5 metre square and 15 metre square roof pack sizes.

  • Cure It Evo Primer Pack (Available as 7.5 metre square / 15 metre square)
    Pack includes: Evo Primer / Mechanical Washer Fixings / Installation Instructions
  • Cure It Evo Basecoat (15Kg)